Original scientific paper
UDC: 622.56:631.432.1
DOI: 10.7251/afts.2014.0610.073S
COBISS.RS-ID: 4226584



 

PROBLEMS OF HERMETICALITY OF WELLS FOR LEACHING IN “TETIMA” MASSIF AND REPAIRING CONSTRUCTION IN CASE OF UNHERMETICAL COLUMN PIPES 9 5/8"

 

Šabović Almir1, Nuhanović Sanel2, Hodžić Adnan2, Nalić Adnan1

 

1Rudarski institut Tuzla, E.mail: almir.sabovic@hotmail.com   
2Rudarsko-geološko-građevinski fakultet Tuzla

 

 

 

ABSTRACT  Full text (pdf)

SUMMARY

As it is known, the extraction of rock salt from deposit “Tetima”, Majevica, performed is by controlled leaching in the underground chambers positioned diply in the salt deposit. The connection between the underground chamber, that represents the basic production unit in the primary salt production and technological installations on the surface, is through a deep wellbore, which is an integral part of the leaching system.


Key words: hermeticality of wells, construction of wells, procedures of repairing, “Tetima” massif
 

LITERATURE

[1]

Hrković, K. Bizjak, R.(2002): Theoretical aspects and application of investigating-exploitation drilling. Belgrade. Technique and technology.

[2]

Hadžihrustić, Z.(2006): Exploration I. University of Tuzla, Faculty of Mining, Geology and Civil Engineering Tuzla.

[3]

Matanović, D. (2006): Technique of making borehole-Manual with examples. University of Zagreb, RGN facultyt Zagreb.

[4]

OOUR Institut za rudarska istraživanja Tuzla., PBZG „KOPEX“ Katowice „Chemkop“ Krakow (1989). Main mine design for  „Tetima“ Tuzla, rock salt exploitation.

[5]

„Geotehnika“ Zagreb (1988). Technical design of the drilling and installation of exploitation wells in rock salt deposit „Tetima“, from the surface.

[6]

Investment – technical documentation, Rudarski institut d.d. Tuzla.

[7]

Tomić, B., Hodžić, A.(2004): Surface and borehole exploitation of mineral resources. University of Tuzla, Tuzla RGGF.

[8]

IImrahimpašić, I. (1967). Contribution to the methodology of studying primary cementing to prevent accidental ejection of oil wells. Zagreb. Mining, Geology and Petroleum Engineering, University of Zagreb.

 

 

 

  

  

  

  

  

  

 

   

 
Copyright Tehnički institut Bijeljina, 2010.
Web dizajn : Stanko Zarić

uređuje: www.asteh.com