petak, 20 okt 2017

Baner
Baner
Baner

 

Review paper
UDC: 624.014.2.04
DOI: 10.7251/afts.2015.0713.025D
COBISS.RS-ID 5435416
 
 
AN EXAMPLE OF „MODERN CONSTRUCTION
OF THE FACILITY“
 
Đurić Neđo1
 1Technical Institute Bijeljina, Bosnia & Herzegovina, e.mail nedjo@tehnicki-institut.com
 

ABSTRACT  Full text (pdf)

Today's building of facilities does not follow the study of the characteristics of the terrain on which the facility is constructed. The period of rapid construction, which can be called the "modern construction" does not follow the quality of constructed facilities. Usually it is the uncontrolled building, where is only important to build a facility without taking into account the conditions of its construction and safety during exploitation.Many steps before and during the construction of facilities are neglected, which is reflected in their safety, especially after its construction.
 
The paper gives an example of a negative construction of facilities, as well as an overview of what is within the geological research andstudies of the field that need to be done to adequately define the geological and geotechnical characteristics of the terrain, as the basis on which the facility is constructed. This example is just one of many negative examples today.
 
Key words: modern construction, research of the field, facilities, sediments

 

REFERENCES

[1]
Osnovna geološka karta SFRJ 1:100 000, list Brčko, L 34 – 110, sa tumačem. Savezni geološki zavod. Beograd (1980). 
[2]
Osnovna geološka karta SFRJ 1:100 000, list Tuzla, L 34 – 122, sa tumačem. Savezni geološki zavod. Beograd (1980). 
[3]
Đurić, N. Hidrogeološka i inženjerskogeološka istraživanja. Građevinski fakultet Subotica, Tehnički institut Bijeljina. Subotica, Bijeljina.
[4]
Standard Test Procedures Manual. Fondation investigation – Dynamic cone Penetrometer, Saskat chewan Highways and Transportation. 1992.
[5]
Mn Road – Office of Minesota Road Reaserch – User guide to the Dinamic cone Penetrometer.
[6]
Mataradžije, Milada (2014). Geotechnical properties of mechanicallycompacted Koševo layers. Arhiv za tehničke nauke br. 10. Tehnički  institut  Bijeljina. pp. 39–46.
[7]
Đurić, N. (2013): Stepen istraženosti terena za Termoelektranu 2 x 200 MW, Ugljevik 3 – nivo Idejnog projekta. IV simpozijum sa međunarodnim učešćem „Rudarstvo 2013“ Planovi razvoja i unapređenje rudarstva. Veliko Gradište, Srebrno jezero, Srbija. Zbornik radova str. 82-89.
[8]
Đurić N., Đujić A., Mitrović P., Tadić S. (2009): Analiza stabilnosti i prijedlog sanacije terena za potrebe izgradnje centra za hemodijalizu u krugu Opšte bolnice „Sveti Apostol Luka“ u Doboju. Treće naučno – stručno savjetovanje „Geotehnički aspekti građevinarstva“. Zlatibor, Srbija.
[9]
Đurić N., Đujić A., Mitrović P., Tadić S. (2009):Analiza stabilnosti i prijedlog sanacije terena za potrebe izgradnje centra za hemodijalizu u krugu Opšte bolnice „Sveti Apostol Luka“ u Doboju. Treće naučno – stručno savjetovanje „Geotehnički aspekti građevinarstva“. Zlatibor, Srbija.
 
Copyright Tehnički institut Bijeljina, 2010.
Web dizajn : Stanko Zarić

uređuje: www.asteh.com