×
Home Current Archive Editorial board
News Contact

Archive

More Filters

Contents

Prevention of the surface water quality deterioration as a result of motorway construction or similar anthropogenic activities is certainly a rather more demanding task relating to watercourses with lower flow rates than larger watercourses. The paper presents the impact of part of the Banja Luka - Doboj motorway construction site, notably section ...

By Nebojša Knežević, Dušica Pešević

December 2019 Original scientific article Environment
QUALITY ASSESSMENT OF VEGETABLE OIL EFFLUENT DISCHARGED INTO SAVA RIVER

Subject of this paper is the analysis of technological waste water within the business complex of BIMAL d.d.Brčko, which is generated as a result of technological processes within the oil refinery, press plant and extraction plant. This paper is aimed at establishingwhether the registered values of the tested parameters, based on physicochemical an...

By Dušica Pešević, Nebojša Knežević, Mirjana Marković

The purpose of the wastewater treatment plant project is to implement and achieve the goals set in the water management bases of the Republika Srpska and the Federation of BiH, which identified the necessary sectoral investments and the development of the institutional capacity needed to meet the requirements of the European directives. By implemen...

By Nebojša Knežević, Dušica Pešević, Igor Milunović

Air quality measurement was conducted in the vicinity of the industrial plot that belongs to RS Silicon LLC Mrkonjić Grad where a plant for the production of the silicon metal is constructed, during the period January – December 2015; this air quality measurement comprised the immissions concentrations of CO, SO2, NO2 and total suspended particles ...

By Dušica Pešević, Nebojša Knežević

The paper presents the impact of the construction site of a part of the Banja Luka – Doboj motorway, section 1: Banja Luka – Prnjavor, in the settlement of Miloševac, on the quality of water in the rivers Vrbas and Crkvena. Before the construction of a new bridge, the zero state was determined in the direct vicinity and at locations downstream from...

By Dušica Pešević, Nebojša Knežević

Construction of the silica material factory named "R-S Silicon", with an annual production capacity of 15,210 ton of Si-metal, was planned in the village of Bjelajce, municipality of Mrkonjić Grad. The factory for production of Si-metal shall have direct and indirect environmental impacts, especially on waters, by washing off working areas, leachat...

By Dušica Pešević, Nebojša Knežević