Comsar Energy Republika Srpska Banja Luka , Banja Luka , Bosnia and Herzegovina
Comsar Energy Republika Srpska Banja Luka , Banja Luka , Bosnia and Herzegovina
Comsar Energy Republika Srpska Banja Luka , Banja Luka , Bosnia and Herzegovina
In this article are presented the procedures and the results of open pit optimal contour "Delici" choice near Ugljevik, Republic of Srpska. By using of LG 3D algorithm for optimization in the Whittle FourXTM is determined a series of open pit shales based on the various income factors (Revenue factor) with iteration of 0.03 of change in coal prices according to the base price of 2.2 €/GJ. For each contour were calculated the cash flows, and the optimal contour of open pit was determined based on the maximum value of NPV (net present value). The access ramps, transport roads, geometric elements of benches, final slopes and calculations of the exploitation coal reserves were done inside of the optimal open pit contour. After determing of optimal open pit contour it was defined the mine plan, dynamics of exploitation and choice of waste disposal location.
This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.