×
Home Current Archive Editorial board
News Contact
Original scientific article

GEOTECHNICAL INVESTIGATIONS FOR TREATMENT THE BRIDGE ON THE SAVA RIVER IN BRČKO

By
Neđo Đurić ,
Neđo Đurić
Contact Neđo Đurić

Tehnički institut , Bijeljina , Bosnia and Herzegovina

Anđa Đujić ,
Anđa Đujić

Tehnički institut , Bijeljina , Bosnia and Herzegovina

Petar Mitrović ,
Petar Mitrović

Tehnički institut , Bijeljina , Bosnia and Herzegovina

Snežana Tadić ,
Snežana Tadić

Tehnički institut , Bijeljina , Bosnia and Herzegovina

Jovo Miljanović
Jovo Miljanović

Tehnički institut , Bijeljina , Bosnia and Herzegovina

Editor: Neđo Đurić

Abstract

The bridge on the Sava River, which connects the town of Brcko the Croatian Republic was built around 100 years ago and has mainly been continuously open to traffic. Occasional delays before World War II and during World War II when it was demolished in the construction of one field of pillars, represent the creation of the periods in respect of his period eksploatacieje.

In early 2007, there was a damage to one bridge pillars, which are of such proportions that the freight traffic completely stopped. Were carried out geotechnical investigations about some damaged stairs and the immediate environment that is stable, which is not observed damage to the bridge piers. The results obtained define the unstable zone for which there has been damage to the bridge pier, and used to determine the technical recovery solutions

Citation

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. 

Article metrics

Google scholar: See link

The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.