GEOTECHNICAL CONDITIONS FOR CREATION OF THE VERTICAL SHAFT FOR RECONSTRUCTION OF OIL PIPELINE FROM TERMINAL BROD TO CROATIAN BORDER ON SAVA RIVER
Reconstruction of share in an existing corridor of Terminal Brod to the Croatian border on the Sava River is part of the corridor, which continues to go across the river to Slavonski Brod. The existing corridor will be replaced on a part of Sava River, where is planned a production of a tunnel with two vertical shafts on the banks of the river. Res...
By Neđo Đurić, Petar Mitrović
INŽENJERSKOGEOLOŠKI I GEOTEHNIČKI ISTRAŽNI RADOVI ZA NADVOŽNJAK NP1 NA KORIDORU Vc
Koridor Vc je dio mreže TEM transportne infrastrukture Jugoistočne Evrope, koji prolazi kroz Bosnu i Hercegovinu. Trasa počinje na sjeveru od rijeke Save, odnosno granice Hrvatske do Jadranskog mora. Za potrebe izrade projektne dokumentacije od idejnog rješenja do glavnog projekta, provedena su određenja istraživanja terena u dijelu trase i ...
By Neđo Đurić, Petar Mitrović, Anđa Đujić, Snežana Tadić
GEOTECHNICAL INVESTIGATIONS FOR TREATMENT THE BRIDGE ON THE SAVA RIVER IN BRČKO
The bridge on the Sava River, which connects the town of Brcko the Croatian Republic was built around 100 years ago and has mainly been continuously open to traffic. Occasional delays before World War II and during World War II when it was demolished in the construction of one field of pillars, represent the creation of the periods in respect of hi...
By Neđo Đurić, Anđa Đujić, Petar Mitrović, Snežana Tadić, Jovo Miljanović
GEOTECHNICAL RESEARCH AND REPAIRING MUDSLIDE "POLOMA - II" ON THE WAY DRINJACA - BRATUNAC
On the way Drinjaca - Bratunac, near the Drina River in the village of Polom II, activated during the landfall of works execution on the existing paving times. Time is built in the early twentieth century along the left bank of the river Drina. Given that the coast of the river Drina quite steep, it is in some parts of the route came to creat...
By Neđo Đurić, Petar Mitrović, Milan Perišić
LANDSLIDE ON RAILROAD TUZLA – ZVORNIK
On the railroad Tuzla – Zvornik, on stacionage km 41+150 – km 41+200, there is a landslide on the left cut, 50 m before the entrance to the tunnel. There have been partial repairs over the years, but without any former detailed researches, so no proper solutions were found. Frequent repairs, like building shallow supporting walls, haven...
By Anđa Đujić, Neđo Đurić, Petar Mitrović
SANCTION FOUNDATIONS OF BUILDINGS INJECTION FIELDS PROCEDURE "JET GROUTING"
The paper describes a new way of injecting soil in order to repair the foundation of building facilities. This procedure is known under the name "JET grouting. Property procedure is that the depth of the ground, below ground facility, the addition cementnog veziva, create posts of autochthonous soil and cement, with a much stronger mechanical (defo...
By Petar Mitrovic