Techniical institute Bijeljina , Bijeljina , Bosnia and Herzegovina
Improvement of the quality of the route is necessary because of its importance in connecting countries of the Western Balkans to central and western Europe. This is the worst section of the road from Albania via Montenegro and Bosnia and Herzegovina to the corridor Vc, which passes through the central part of Bosnia and Herzegovina. The route of the road is very narrow with sharp bends, which requires its extension, correction, and in some parts relocation. It was therefore necessary first to give geological evaluation of the state of route in terms of exploration and characteristics of the rocks involved in the structure of the ground along the route.
We analyzed the available documentation of previous studies and conducted field data. Summarizing the results available, it was given the evaluation of the degree of exploration of the terrain and the need for new research for detailed consideration of the characteristics of the terrain, especially in the construction of facilities on the route.
This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.