PC Elektroprivreda ZD Mines “Kreka” Tuzla Ltd , Tuzla , Bosnia and Herzegovina
BCC Tuzla Canton , Tuzla , Bosnia and Herzegovina
Taking into consideration the current situation in the field of energy, the specific conditions of our mining and contemporary achievements in the field of underground exploitation, it can be stated that new circumstances in terms of techno-economic and security parameters of exploitation in the whole system of the exploitation of the coal deposits are present. The aim of this paper is to contribute to solving the problem of the subsidence of ground surface caused by excavation and utilization of the reserves of deposits that are nonrenewable and important economic resource. It is oriented towards solving this problem in order to avoid deformations of ground surface caused by the excavated empty underground area. By solving this problem, the empty excavated area is filled and the problem of the deformations of ground surface is reduced or permanently solved. The paper proposes the potential composition of backfill for filling the excavated empty area. This paper presents a solution based on filling the excavated empty area.
This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.