HAULAGE ANALYSIS IN THE AIM OF THE COMBINED SYSTEM APPLICATION ON THE LEAD AND ZINC MINE "SASE" SREBRENICA

By
Duško Torbica ,
Duško Torbica
Contact Duško Torbica

aculty of Mining Prijedor, University of Banja Luka , Banja Luka , Bosnia and Herzegovina

Vladimir Malbašić ,
Vladimir Malbašić

aculty of Mining Prijedor, University of Banja Luka , Banja Luka , Bosnia and Herzegovina

Dražana Tošić ,
Dražana Tošić

Faculty of Mining Prijedor, University of Banja Luka , Banja Luka , Bosnia and Herzegovina

Jovan Popović
Jovan Popović

Faculty of Mining Prijedor, University of Banja Luka , Banja Luka , Bosnia and Herzegovina

Abstract

One of the most important influencing factors on the economy of mines with surface and underground exploitation is the correct choice of haulage technology of ore and waste.

The paper analyzes the haulage of ore and waste in the Lead and Zinc Mine “Sase” Srebrenica and determines the optimal haulage length on the four excavation blocks for the application of the new haulage system by using the mine trucks from the aspect of set criteria, increasing capacity and reducing haulage costs through the techno – economic analysis and optimization.The optimal haulage length is determined through the calculations of the loader capacity and the possible choice of the truck
depending on the stated criteria.

References

1.
Supplementary mining project of adopted excavation methods of the Lead and Zinc Mine “Sase. In: Srebrenica. 2010.
2.
Malbašić V, Čelebić M. Haulage of bulk materials in surface mines, Continuous haulage. 2019.
3.
Aziz N, Keilich W. Haulage Optimisation in An Australian Underground Metal Mine, Faculty af Engineering. 2018.
4.
Salama JA, Greberg J. Optimization of Truck-Loader haulage system in an underground mine: A simulation approach using SimMine. 2009.
5.
Çetin N. Open pit truck/shovel haulage system simulation. In: Ph Dthesis, The Graduate School of Natural and Applied Sciences of the Middle East Technical University – Department of Mining Engineering. 2004. p. 111.
6.
Drebenstedt C. The Responsible Mining Concept. In: Proceedings of the 22nd MPES Conference. 2013. p. 3–22.
7.
Malbašić V, Stojanović L, Kovačević Ž. Hualage of bulk materials in surface mines, Discontinuous haulage. 2019.
8.
Malbašić V. Model for evaluation of haulage systems in the function of long-term planning of surface mines. 2007.
9.
Popović N. Scientific fundamentals of surface mining design. 1984.
10.
Banović V. Haulage of ore and tailings in the lead and zinc mine “Sase.” 2014;
11.
Majstorović S, Malbašić V. Introduction in mining. 2013.
12.
Runge CI. Mining economics and strategy, SME. 1997;
13.
Usorac S, Jovanović N. Analysis of the impact of the change of the haulage system on the costs of OP “Dobrnja” near Banja Luka. 2020;

Citation

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. 

Article metrics

Google scholar: See link

The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.