GEOTECHNICAL CONDITIONS FOR CREATION OF THE VERTICAL SHAFT FOR RECONSTRUCTION OF OIL PIPELINE FROM TERMINAL BROD TO CROATIAN BORDER ON SAVA RIVER
Reconstruction of share in an existing corridor of Terminal Brod to the Croatian border on the Sava River is part of the corridor, which continues to go across the river to Slavonski Brod. The existing corridor will be replaced on a part of Sava River, where is planned a production of a tunnel with two vertical shafts on the banks of the river. Res...
By NEĐO ĐURIĆ, PETAR MITROVIĆ