LANDSLIDE REMEDIATION ON THE SCARP ABOVE THE LEVEL, ROAD M-17, SECTION: 007, TOPČIĆ POLJE – LAŠVA
The aim of this paper is to present a landslide remediation based on research and testing of samples, and to list those measures that will help to remediate the landslide or partially mitigate its further effects. These measures include: closing cracks, collecting and draining surface water from landslides, terrain planning, making supports from st...
By Zlatan Talić, Dženita Cerić
LANDSLIDE REMEDIATION ON LOCATION ČOLE, THE SETTLEMENT ŽELJEZNO POLJE, ŽEPČE MUNICIPALITY
The aim of this paper is to present a landslide's remediation conducted on the basis of research and testing of samples, and list those measures that will help to remediate the landslide or partially mitigate its further effects. These measures include: closing cracks, collecting and draining surface water from landslides, terrain planning, making ...
By Zlatan Talić, Dženita Cerić, Ajla Rekić, Anela Hrnjica
INFLUENCE OF CREEP CONCRETE ON SPACE STABILITY THIN-WALLED DOME COVERINGS
The task was set, due to the capabilities of modern software systems, to assess the effect of the increase in inelastic deformations under prolonged load action on the loss of stability of thin-walled dome coverings. The study of the dependences of the forms of the loss of stability of dome covering from creep concrete that will help further with o...
By Sergey Gridnev, Ekaterina Prokshits, Olga Sotnikova, Iana Zolotukhina
ENGINEERING GEOLOGICAL AND GEOTECHNICAL CHARACTERISTICS OF LANDSLIDE IN GORNJI HRGOVI, MUNICIPALITY OF SREBRENIK
Natural disasters during May 2014 caused a flood of water outside the unregulated bed of the river Tinja in the local area of Gornji Hrgovi. The flood effect affected the undermining and destruction of the foot part of the slope, reactivation and regressive development of the landslide, which was manifested by further secondary “breaking&rdqu...
By Jasenko Čomić, Aida Hrustić
DEVELOPMENT OF A METHODOLOGY FOR STABILITY MONITORING OF A DEFENSE EMBANKMENT LOADED WITH FREQUENT TRAFFIC: THE EXAMPLE OF THE KOVIN MINE
In the present paper, the authors develop a methodology for stability monitoring of the hydrotechnical-defensive embankment that is exposed to heavy frequent traffic. The proposed methodology envisages several phases of observation, work and monitoring: (1) macroscopic observations, (2) geophysical-geoelectric tests, (3) group of exploration works,...
By Srđan Kostić, Nebojša Nikolić, Vladimir Malbašić
LANDSLIDES ON THE ROADS OF THE NORTHERN PART OF THE REPUBLIC OF SRPSKA AS A RESULT OF ELEMENTAL OR ANTHROPOGENIC PROCESSES
The Republic of Srpska, which is an integral part of Bosnia and Herzegovina, was affected by intense precipitation during May 2014 and May 2015. The northern part of the Republic of Srpska is located between the plain area of the Sava River and the mountain massif of the inner Dinarides, while the eastern and western parts are confined to the river...
By Neđo Đurić, Dijana Đurić
GEOTECHNICAL CHARACTERISTICS OF TERRAIN AND PROPOSAL FOR SANATION MEASURES OF LANDSLIDES SULJENDICI, MUNICIPALITY SREBRENIK
Period of intense rainfall during May 2014 was characterized with the occurrence of a large number of landslides on terrains that have not been previously threatened by human activities, and also terrains that were the subject of engineering activities. To separate terrains that are not threatened by human activities is difficult. Still they can be...
By Neđo Đurić, Kenan Imširpašić, Alma Hadžiosmanović, Anđa Đujić
GEOLOGICAL EVALUATION OF THE STATE OF THE ROUTE M18, SECTION FOCA – HUM, REPUBLIC OF SRPSKA
Improvement of the quality of the route is necessary because of its importance in connecting countries of the Western Balkans to central and western Europe. This is the worst section of the road from Albania via Montenegro and Bosnia and Herzegovina to the corridor Vc, which passes through the central part of Bosnia and Herzegovina. The route of th...
By Neđo Đurić, Andja Djujic
STRESS CHANGES IN CEMENTED BOREHOLE ANNULUS
Cemented boreholes annulus its stability achieved tightness must be maintained in the continuation phase of drilling, is that in the process of drilling, cementing, production. Preserving stability in the working life of the wells threatened and technological stage of the production process due to the natural development of conditioned stress-laden...
By Zvonimir Bošković, Vladimir Čebašek
THE RESULTS OF AT ROOFBOLTING SYSTEM OF SUPPORT APPLICATION IN ''SOKO'' UNDERGROUND MINE
Complex mining and geological conditions of coal exploitation, such as the Soko mine, requiring theconstant work on the research of new technical solutions of development and supporting of theunderground openings.In this paper presented detailed description of the existing way of development and supportunderground openings at the mine Soko.Experien...
By Jovo Miljanović, Žarko Kovačević, Dražena Tošić